Planning Commission continues review of 16‑unit Amado/Sunrise condo project over backyard access, shade and utility questions
Summary
The Palm Springs Planning Commission continued a proposed 16‑unit condominium project at Amado Road and North Sunrise Way, asking the applicant to return with a shade study for west‑facing upper units and options for backyard access and landscaping service access; staff had recommended approval with a CEQA mitigated negative declaration.
Get email alerts on the Housing Development topic
No spam. Unsubscribe anytime.
The Palm Springs Planning Commission on July 28 continued consideration of a 16‑unit condominium project proposed by GMS of the Desert at the northwest corner of Amado (Amato) Road and North Sunrise Way. Staff recommended the commission adopt a CEQA mitigated negative declaration, approve the development permit and tentative tract map, and recommend a general plan amendment to medium density residential, but commissioners raised unresolved site‑planning concerns.
Planning staff told the commission the 1.34‑acre site would be developed with 16 modest three‑bedroom units, two‑car garages, private backyards and small pools, and that the project "meets the city standards" for density, open space and shading in the Section 14 specific plan. The city's environmental consultant, Nicole Chris of Terra Nova Planning, said the matter "would have been eligible for an exemption as an infill project except that there's a general plan amendment," and described standard mitigation measures for biological resources and completed tribal consultation.
During questioning, commissioners pressed staff and the applicant for details about utilities, the center median along Sunrise Way that the developer will be required to install, drainage and, most critically, how landscapers and pool service personnel would access backyards on the west side of the development without walking equipment through homes. The architect said upper‑floor balconies have roughly 3–4 foot overhangs and that the applicant will provide shade glass and other measures, but several commissioners said they were not convinced the overhangs alone would prevent late‑afternoon overheating of west‑facing living areas.
Applicant George Youssef said the team is proud of the design and roof form but acknowledged market uncertainty and the permitting and street‑improvement work that still lies ahead: "It's been a hell of a trip to come to this point," he told the commission. Neighbors at the hearing were mixed: Tom Finan, a homeowner behind the site, sought clarification about the exact site and driveway access, while online commenter Jared Bridal praised the architecture and said the project would improve a vacant lot.
After extended exchange, the commission voted to continue the item and asked the applicant to return at a date certain with a west‑side shade study (late afternoon sun), a clear plan for backyard access and servicing (gates, alleyway or alternate easement), and a preliminary utility plan so the commission can better evaluate on‑site circulation and maintenance impacts. The commission explicitly requested that staff add the engineering conditions that were delivered late to the packet into the record so they are enforced when the item returns.