Continuance noted for proposed garage encroachment on Watterson No.2 Drain
Summary
Timothy and Celeste Arens continued their petition (DOC# 26-051) for a 37' x 32' three-car garage proposed 15' from the top of bank; agenda notes the item was continued from March 19, 2026 to collect historical drain-construction data and that the surveyor offered no recommendation.
Get email alerts on the Encroachment topic
No spam. Unsubscribe anytime.
Timothy and Celeste Arens filed DOC# 26-051 seeking approval to build a 37-foot by 32-foot three-car garage 15 feet from the top of bank of the Watterson No.2 Drain at 13621 Wesley Chapel Rd. The agenda indicates the petition was continued from the March 19, 2026 meeting to allow staff to collect historical data on when the regulated drain was first constructed.
Unlike several other items on the agenda, the surveyor's section for this petition states a "No recommendation." The filing also notes the proposed location is on a significant slope and would require an eight-foot high exposed rear foundation wall and would provide only 16 feet of maintenance width adjacent to the drain. The agenda lists no vote or action outcome.