Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Platting topic

No spam. Unsubscribe anytime.

Commission approves final plat for Damascus Trail, three lots allowed

Butler County Planning Commission · August 6, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission approved PL24-22, the final plat for Damascus Trail allowing three lots (approx. 8.87, 55.41 and 12.9 acres). Staff noted water availability for Lots 2 and 3 and a driveway requirement through a floodplain for Lot 3. The motion passed 5-0.

The Butler County Planning Commission approved the final plat PL24-22 for Damascus Trail, which will create three lots off Southwest Buffalo Road in Towanda.

Planning staff outlined lot sizes — Lot 1 approximately 8.87 acres, Lot 2 approximately 55.41 acres and Lot 3 approximately 12.9 acres — and said water could be made available to Lots 2 and 3 if needed. Staff also said Lot 3's driveway would cross a small floodplain area and that any fill greater than 1 foot would trigger a state permit. "Lot 1 is approximately 8.87 acres," staff noted during the presentation.

Agent Roger Cuttsinger said the plat had been prepared to meet county requirements. Commissioners voted 5-0 to approve the final plat and advised that the matter will appear before the county commission for final administrative processing.