Council authorizes $22,295 repair to sinkhole and pipe at Municipal Lot #1
Summary
Union City Council approved spending $22,295 to replace about 10 feet of pipe, install a larger catch basin, reconnect pipes and close a sinkhole at Municipal Lot #1 after engineer and consultant recommendations; Mansfield was selected over a $23,450 bid from McLallen Construction.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Union City Borough Council authorized $22,295 to repair a sinkhole and restore stormwater piping at Municipal Lot #1.
Streets Supervisor Bob Phillips described a collapsed section affecting a 24‑inch clay tile and recommended repairs after consultations with Insight (Bob Carpenter) and engineer Tim Wells. The work scope approved calls for replacing the damaged 24" tile segment, reconnecting pipes in the sinkhole area, installing a larger catch basin and replacing approximately 10 feet of pipe.
Two estimates were presented: Mansfield at $22,295 and McLallen Construction at $23,450; both bids required the borough to provide a truck during the project. Councilor Steadman moved and Councilor Osborn seconded the contract award to Mansfield; the motion carried unanimously.
The minutes do not specify the project start date or duration. The borough will provide equipment support as required by the contractor bids.