Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Streets And Roads topic

No spam. Unsubscribe anytime.

Makanda board reviews recent roadwork, culvert schedule and proposes Streets & Roads hire

Village of Makanda Board of Trustees · October 7, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Trustees reported inspection of resurfaced roads, placement of leftover rock, the Sept. 18 installation of a culvert on Hartline Road, and a planned Oct. 9 culvert on North Poplar Camp; the board signaled support for hiring Dana McGuire to assist with Streets and Roads.

Trustees reported progress on multiple Streets & Roads items at the Oct. 7 Village of Makanda meeting. Trustee Hilliard said he inspected four roads with the Illini crew during resurfacing and arranged to have leftover rock placed beside the maintenance building parking lot. Trustee Wolff said he and Dan met with Beck Simonds to review requirements for culvert installation on Hartline Road; that culvert was installed and inspected Sept. 18.

The board reported a second culvert is scheduled for North Poplar Camp on Thursday, Oct. 9 (weather permitting). The road is to be closed 9 a.m.–2 p.m.; property owners will be notified and notices posted at the Post Office and on Makanda Happenings. President Shingleton told trustees she had polled them about hiring Dana McGuire to help with Streets and Roads and that board members indicated support; a meeting with Dan to follow to finalize scheduling.

No formal hiring vote was recorded in the minutes; trustees discussed logistics and inspection follow‑up for culvert work.