Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Construction topic

No spam. Unsubscribe anytime.

Contractor granted temporary sidewalk closure for Harrison Place construction through Oct. 31

City of Lockport Common Council · August 14, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Modern Surface Solutions received permission to close the north-side sidewalk along 210 Walnut Street (Harrison Place campus) from Aug. 10 through Oct. 31, 2024, contingent on insurance and compliance with city code.

The Common Council on Aug. 14 approved a request from Modern Surface Solutions to close the section of sidewalk on the north side of Walnut Street along 210 Walnut Street (Harrison Place Campus) from Aug. 10 through Oct. 31, 2024 to facilitate construction at Building 2. The permission is contingent on Modern Surface Solutions filing a certificate of insurance naming the City as additional insured and following Lockport City Code requirements.

Alderman Craig moved the resolution and it was adopted (Ayes 4). The minutes do not record a detailed traffic-control plan or pedestrian detour specifics; compliance with code and insurance filing are the conditions recorded.