Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Stormwater Infrastructure topic

No spam. Unsubscribe anytime.

Select Board approves added engineering work for Fairview/Bridal and extra culvert design on Donna/Nadine

Pembroke Select Board · June 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized change orders and additional engineering and survey work with KB Partners to address drainage issues on Fairview/Bridal and an added culvert on Donna/Nadine; staff will proceed to public hearing for funding from capital reserves for construction.

Public Works told the Select Board that additional surveying and design work is required after field discoveries on Fairview/Bridal and a failing culvert on Donna Drive. The additional design and survey work will be funded from the town's engineering line and will establish necessary easements where pipework crosses private parcels.

Staff explained one culvert replacement is Tier 2/3 stream crossing and will require state permits; another recently discovered culvert was added to the scope, increasing the design cost. The board moved, seconded and approved the amended contracts with KB Partners and authorized the public works director to sign the agreements. Board members asked staff to notify affected property owners, secure easements where needed and present maps showing the work before proceeding to public hearing for construction funding.