Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Drainage Easement topic

No spam. Unsubscribe anytime.

Wilbraham OKs two-year extension for Stony Hill drainage work tied to Boston Road sidewalk plan

Wilbraham Conservation Commission · January 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Conservation Commission voted 4-0 to extend a 2023 Determination of Applicability for a drainage pipe extension at 185 Stony Hill Road, allowing the town time to secure a permanent easement from an abutter needed for a sidewalk connection to Boston Road.

The Wilbraham Conservation Commission voted to issue a two-year extension of a Determination of Applicability for the Town of Wilbraham Department of Public Works to install an extension of a drainage pipe at 185 Stony Hill Road. Dena Grochmal, representing the Wilbraham DPW, told the commission the work is part of a wider sidewalk plan that will connect to Boston Road and that the town needs a permanent easement from an abutter for a portion of the pipe; the original determination was issued in 2023.

James Murphy made the motion to issue the two-year extension, seconded by James Coletta; commissioners Stoughton Smead, James Murphy, Robert McMaster and James Coletta voted in favor. The extension gives the town time to secure the easement before work proceeds; the DPW remains responsible for complying with any conditions tied to the original determination and for coordinating any required erosion controls or site protections prior to construction.