Selectboard schedules maintenance: Little School roof and town office door among items assigned
Summary
The Selectboard addressed multiple building maintenance items March 24, 2026: a Little School roof leak inspection and repair, GFI outlet installation targeted for April 1, town garage structural and electrical repairs, and authorization to replace the Town Office door for accessibility.
Get email alerts on the Building Maintenance topic
No spam. Unsubscribe anytime.
The board reviewed several building maintenance items. A minor roof leak at the Little School, attributed to ice buildup during rapid snowmelt, will be inspected and repaired when roofers are in the area. An electrician will provide a quote and schedule installation of a GFI outlet at the Little School with a target date of April 1.
For the Town Garage, Aaron Bobar is assigned to reinforce front steel beams, address cold air infiltration, install a new shop light, and repair an outdoor outlet. The board also authorized installation of a new outward‑swinging Town Office door to improve accessibility. Minutes record assignments and expected contractor follow‑up but do not list firm contractor names (except Aaron Bobar) or cost estimates for the door replacement.