Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works topic

No spam. Unsubscribe anytime.

Council hears stormwater audit findings and green-waste, recycling challenges

Wellsville City Council · September 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City staff reported a recent three-day stormwater audit that will produce 60–100 corrections and about 100 pages of required changes; council also discussed illegal dumping at the gravel pit, metal-bin removal and green-waste costs that may require revisiting service options.

Staff reported that a state stormwater audit examined the city’s permit and operations line by line and will produce a report with roughly 60–100 corrections and about 100 pages of findings.

Scott said changes will be needed to address state requirements—for example, concrete pads under green-waste/metal bins to prevent leachate and moving the metal recycling bin to a hard surface; the city manager warned the metal bin could be removed if illegal dumping persists. The council heard cost examples showing per-bin haul and tonnage costs could run to approximately $180–$190, and that current ad-hoc cleanup efforts exceed small monthly revenue generated by the program.

Councilors supported pursuing refined pricing or options with Waste Management and other vendors; staff will draft next steps for the council to consider.