Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Bridge topic

No spam. Unsubscribe anytime.

Select Board authorizes $488,078.43 MassDOT small‑bridge contract for Campbell Falls Road

Select Board of New Marlborough · July 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Select Board voted to authorize the Town Administrator to sign a MassDOT small‑bridge construction contract and for the chair to accept a $488,078.43 grant to repair the historic keystone bridge on Campbell Falls Road; construction is expected in spring–fall 2027 with a temporary road closure.

The Select Board voted unanimously on July 20 to authorize Town Administrator Mari Enoch to sign the MassDOT contract associated with a Municipal Small Bridge program grant of $488,078.43 for repairs to the historic keystone bridge on Campbell Falls Road. The board also voted to authorize Chair Tara B. White to accept the Phase 2 construction agreement for the same amount.

Mari Enoch said the contract with MassDOT is valid through Dec. 31, 2027, the repair is fully engineered and in the final permitting stage, and that construction is expected to begin in spring 2027 and conclude in fall 2027; the town anticipates a temporary road closure during the work. The board recorded the motions and roll-call votes: the motion authorizing Mari to sign the MassDOT contract passed with Tara B. White, Bill West and Maggie Arian voting aye; a separate motion authorizing the chair to accept the grant passed unanimously.