Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water Infrastructure topic

No spam. Unsubscribe anytime.

Water Superintendent: Well #3 back online; probe replacement and bridge reroute planned

Mount Carroll City Council · March 25, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Water and Sewer Superintendent Jonathan Armstrong told the council that Well #3 is back online, all four pumps are functioning, and the department will replace a multi-DH probe (estimated $3,200) and reroute a main near the Galena Street bridge after three recent leaks.

Water and Sewer Superintendent Jonathan Armstrong reported that "Well #3 is back online," and that the VFDs are repaired so all four pumps are operating. He told the council the department experienced three water-main leaks in the last month, including one by the Galena Street bridge that will require rerouting; Armstrong said contractors provided estimates and Morgan Excavating was the lowest-priced bidder.

Armstrong said the system's multi-DH probe needs replacement at an estimated cost of $3,200 and that hydrant bollards were priced at $250 each. He also reported meeting with the Rotary Club to pursue a matching grant to purchase a hydrant. The council heard these operational updates as part of routine departmental reporting; no separate motion was required.