Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the ADU topic

No spam. Unsubscribe anytime.

Planning board recommends favorable action on ADU at 208 Ridge Street

Winchester Planning Board · July 30, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Contractor Greg Santini presented a rear-lot accessory dwelling unit proposal for 208 Ridge Street; after technical questions about grading, retaining walls and stormwater, the board moved and voted to recommend favorable action on site-plan review.

Greg Santini, contractor for the owner of 208 Ridge Street, described plans for a two-story accessory dwelling unit in the rear of the lot requiring a grade change and retaining wall; he explained the design includes a kitchen/living area on the first floor and a bedroom and bath on a second level.

Board members pressed for details on the retaining wall height, driveway and tree impacts; Santini said the retaining wall would taper and the driveway alignment would avoid removing a 30-foot tree that will remain on site. Planning staff and engineering review were flagged as necessary before a building permit could be issued.

After discussion the board moved to recommend favorable action on the site-plan review for 208 Ridge Street; the voice vote carried without opposition.