Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Cherry Valley waives bid rules, approves $86,620 SCADA panel for Well House #7

Village of Cherry Valley Board of Trustees · March 31, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Trustees waived public-bid requirements under 65 ILCS 5/8-9-1 and approved purchase and installation of a SCADA panel for Well House #7 from Metropolitan Pump Company for $86,620.00 to enable remote monitoring and control of the well system.

The Village Board voted to waive public bidding requirements per 65 ILCS 5/8-9-1 and approved the purchase and installation of a SCADA panel for Well House #7 to control the well pump and enable remote monitoring. Trustee Mike Neville introduced the waiver and purchase; Village Administrator Jim E. Claeyssen explained the panel "is the same that is used at all the wells for communication and it will tie all of them together under the same signal."

The purchase, from Metropolitan Pump Company of Romeoville, Illinois, was approved at a cost of $86,620.00 charged to the 2022 Water Project Fund (line item 5400). The minutes record the board’s roll call approval with a 6-0 vote after the required 2/3 vote to waive bidding.