Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use topic

No spam. Unsubscribe anytime.

Florence OKs final-inspection step, warranty requirements for Waverly Subdivision Phase I

City of Florence Mayor and Board · February 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized city personnel and the engineering service to perform a final inspection before placement of final surface asphalt in Waverly Subdivision Phase I and required a 2-year warranty on Waverly Drive Phase II and a 1-year warranty on remaining Phase I streets.

The Florence Mayor and Board authorized city staff and the city's engineering service to conduct a final inspection before placement of final surface asphalt on Waverly Subdivision–Phase I and set warranty requirements for the development.

City Engineer Tim Parker recommended the inspection step, and the board directed personnel to allow the developer to install required final surface asphalt on Phase I streets after a satisfactory final inspection. The board also required a two-year warranty letter on Waverly Drive Phase II and a one-year warranty letter on the remaining Phase I streets. The motion was made by Alderman Mason Herrin and seconded by Alderman Kyle Martin and carried unanimously.

The minutes do not include the developer's name, the estimated timeline for the final surface placement, or who will enforce the warranty letter; those details will be handled by city engineering and community development staff.