Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Wetland Delineation topic

No spam. Unsubscribe anytime.

Commission accepts wetland delineation for vacant lot at 0 William Street

Dighton Conservation Commission · August 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission reviewed a delineation for a vacant lot at 0 William Street (Map 21, Lot 34B); ProEdge Engineering reported the same unnamed stream runs through the parcel, the botanists agreed on a revised flag line, and the board accepted the delineation, noting future work will require return to the commission.

ProEdge Engineering presented the wetland delineation for 0 William Street and told the commission the same unnamed stream that crosses adjacent parcels runs through this lot. The consultant said they re-surveyed in spring with a botanist and adjusted the flag line accordingly.

"So this piece is part of that last spot here...that same unnamed stream comes through the property along here," the consultant said, explaining why the line was revised. Commissioners accepted the flagged delineation and were told that any work within 100 feet of the wetland will require a separate filing and review. A topographic survey and permanent benchmarks will be required if the owner proceeds to build.