Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Road Maintenance topic

No spam. Unsubscribe anytime.

Road foreman flags truck failures; Selectboard discusses Piper Hill culvert options

Town of Weston Selectboard · May 12, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Road Foreman Jason Hitchcock described recurring electrical and corrosion issues with a 2022 International truck and the board discussed replacing an 18-inch culvert on Piper Hill with a 24-inch pipe.

Road Foreman Jason Hitchcock told the Selectboard the department’s 2022 International truck has experienced repeated problems, including corrosion, electrical failures, wiring deterioration and brake concerns. The vehicle is out of warranty; Hitchcock will obtain repair estimates, evaluate rewiring versus replacement, and gather trade-in value estimates.

Separately, the board reviewed a severely obstructed culvert on Piper Hill that appears to have frost-heaved and shifted uphill. Members discussed replacing the existing 18-inch pipe with a 24-inch pipe and salvaging any usable material from the current installation.