Village authorizes $5.2M appropriation toward US 52 / Route 59 corridor improvements

Shorewood Village Board · September 10, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Public Works Director Nori Akins asked the board to authorize $5,200,000 from village funds to support the village's share of preliminary engineering and design for the US 52 / Route 59 (River Road to Hobolt) improvement project and to enable an ITEP grant application; the board approved the appropriation.

The Village Board approved a resolution authorizing a $5,200,000 appropriation to support Shorewood’s share of preliminary engineering and design for the US 52 / Route 59 (River Road to Hobolt) corridor project.

Public Works Director Nori Akins described the project scope — widening US 52 to four lanes, adding a center median, a mixed-use path and intersection widening at 52 and 59 — and said the village must appropriate funds to be eligible to apply for ITEP grant funding that could cover up to $3,000,000 of eligible construction costs. "So that makes it eligible... if awarded, ITEP will cover approximately 50% of the construction cost up to a maximum of $3,000,000," Akins said. The board approved the resolution on roll call.

Staff said phase 1 engineering is delayed about a year with construction not anticipated until 2028–2029; the measure authorizes the village to pursue grants and coordinate village responsibilities such as utility relocations and signal upgrades.