Commissioners approve $11,900 amendment for PS 450 engineering agreement
Summary
Ottawa County commissioners authorized Modification #1 to the A/E agreement with ms consultants, inc. for the PS 450 Improvement Project, increasing the contract by $11,900 to $197,140 to cover additional design flow calculations and easement work.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
The Board authorized Modification #1 to the architecture/engineering agreement with ms consultants, inc. for the PS 450 Improvement Project, increasing the contract by $11,900 and bringing the total A/E agreement to $197,140. The minutes record that the increase was necessary because of additional design flow calculations and easement work. The motion was moved by Commissioner Donald A. Douglas, seconded by Commissioner Mark E. Coppeler, and approved unanimously.
The item was presented on the recommendation of the Sanitary Engineering Department and approved by the Prosecuting Attorney. The minutes do not provide additional technical details about the design flow calculations or the specific easement parcels; those details would be found in the project engineering files and the modification document.