Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Flood Response topic

No spam. Unsubscribe anytime.

Holiday Hills details flood response: 90,000 sandbags deployed, residents urged to report damage

Village of Holiday Hills Board · April 30, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Village officials reported that Nunda produced 90,000 sandbags with over 15,000 delivered to Holiday Hills within seven days; officials urged residents to report flooding to Fox Waterway Agency and outlined sandbag removal and debris procedures.

Director Dzialo and President Giles briefed the board on post-flood response and recovery. The minutes record: “Reports from Nunda that 90,000 sandbags were made and deployed. Over 15,000 of those came into the Village in 7 days.” Officials asked residents to report all flooding incidents, including photos and descriptions, to the Fox Waterway Agency to help document damages for planning and future assistance.

The board discussed logistics for cleanup: Nunda offered to pick up yard waste that is placed at the roadside (but not material left on private property). Sandbag removal will be scheduled once water levels allow safe access and will be coordinated with Nunda. Officials cautioned residents that sand from deployed bags is contaminated and should not be placed in sandboxes, on property used for play, or on beaches.