Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water Utility topic

No spam. Unsubscribe anytime.

Water operator reports leak, meter replacement and plans to install chlorine pump

Village of Mannsville Board of Trustees · February 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Water operator Norm Jones reported a broken meter at a resident's home that leaked into a basement, installed a new cell meter, ordered a brass baseplate, and said he will contact P&T and Smartech to install a chlorine pump after staff noted strong chlorine batches.

Water operator Norm Jones told the Village of Mannsville board that staff found a water leak that was not caused by the village’s cell meters and that the problem stemmed from a broken meter at resident Brenda Cedars’ house. A new cellular meter was installed at the Cedars residence and the village has ordered a replacement brass baseplate.

Norm reported the pumphouse had a quiet month but said staff observed chlorine batches running "a little strong" for a few days and have been adjusting levels. He said he will contact vendors P&T and Smartech to schedule installation of a chlorine pump to stabilize dosing. He also said Sam, who recently took a school bus driving position, will continue to handle morning water duties before school.

The minutes do not record formal motions or dollar amounts tied to the water repairs; parts and vendor costs were described as ordered or pending.