Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Roads topic

No spam. Unsubscribe anytime.

Trustees weigh $133,411 paving estimate for Lilac Park Drive and hold off on Tower Road paving

Village of Mannsville Board · September 1, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Barrett Paving quoted $133,411 to mill and pave Lilac Park Drive and warned that Tower Road likely needs larger culverts and ditches rather than paving; trustees are awaiting engineering quotes from B&L and possibly GYMO before proceeding.

Barrett Paving inspected Lilac Park Drive (Route 11 to Route 81) and quoted $133,411 for milling and paving, but told trustees a catch-basin installation would require engineered plans before Barrett could quote that portion. Barrett also said full milling might not be necessary depending on engineering results.

On Tower Road, Barrett recommended against paving at this time, stating the road needs larger culverts and improved ditches to stop repeated washouts. The board is awaiting an engineering estimate from B&L and was advised to consider contacting GYMO for additional engineering options. Trustees also noted an emergency repair had been performed on Tower Road by Thomas Excavating after a recent washout.