Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Utilities topic

No spam. Unsubscribe anytime.

Water operator reports wellfield work complete; truck repair quote and engineering estimates discussed

Village of Mannsville Board ยท November 1, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Water operator Norm Jones reported Thomas Excavating finished wellfield work; he also reported a truck repair quote of $2,156.55 to pass inspection and relayed two engineering quotes (B&L $37,500; GYMO $20,500). The board agreed to seek another truck estimate.

Water Operator Norm Jones told trustees that Thomas Excavating completed work on the village wellfield "Looks great. There was no extra work and there was less time than expected," and that an invoice should arrive soon.

Jones also reported vehicle maintenance needs for the village Ford F-250. He said the truck was quoted at $2,156.55 for repairs to pass inspection, including e-brakes, rear brakes and rotors and a rear differential; the board asked staff to obtain an additional estimate before authorizing that level of work. Jones relayed two engineering quotes: B&L at $37,500 and GYMO at $20,500; trustees later moved to select GYMO for Lilac Park Drive engineering.