Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Utilities topic

No spam. Unsubscribe anytime.

Council hires GDS Engineering for electric rate study

Cascade Locks City Council · April 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Cascade Locks approved contracting with GDS Engineering to conduct a COSA electric rate study. The motion was moved by CM Pete Happy, seconded by CM Tiffany Pruit, and recorded as passing unanimously.

Council moved to hire GDS Engineering to perform a COSA electric rate study and approved the contract on April 13. The motion was moved by Councilmember Pete Happy and seconded by Councilmember Tiffany Pruit; the minutes record the motion as passing with all councilmembers and the mayor voting in favor.

The minutes do not include contract amount, scope details, or schedule; the record reflects only the approval to engage GDS Engineering for the rate-study work and directs city staff to proceed with contracting as authorized.