Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Dam Reconstruction topic

No spam. Unsubscribe anytime.

Long Lake hires CHA for Jennings Park Pond geotechnical work at $72,500

Town Board of Long Lake · March 26, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Town Board approved a $72,500 lump‑sum contract with CHA Solutions for supplemental geotechnical and H&H assessment needed for Jennings Park Pond dam reconstruction, citing NYS DEC permitting requirements.

The Town Board on March 26 approved Resolution 20, authorizing CHA Solutions to perform supplemental geotechnical evaluation and hydrology/hydraulics (H&H) assessment for the Jennings Park Pond dam reconstruction. CHA proposed a lump‑sum fee of $72,500; the board adopted the proposal and directed the Town Supervisor to execute a service agreement consistent with CHA’s March 17, 2025 proposal.

Supervisor Clay J. Arsenault and board members described the geotechnical work as required by NYS Department of Environmental Conservation permitting and as part of the contracted town engineering services. The resolution attaches CHA’s proposal to the Town Clerk’s record and tasks the engineer with deliverables and assessments needed for permit applications.