Summary

Public works presented a quote from DiMarzio Concrete to rebuild a failing curve on Liberty (described as 6 inches above grade, 18 inches total) to divert water into an existing drain. Council moved and approved the work by roll call.

Public works reported that a curve on Liberty is failing and proposed reconstruction to redirect water into a drain installed previously. The director described the proposal as a concrete rebuild that "it's 6 inches above grade, 18 inches total," and said sealant and additional measures would prevent future lifting and cracking.

After discussion of alternative resurfacing and contractor experience, a motion to approve the DiMarzio Concrete quote was made. The motion was recorded in the transcript as "Motion by Collins, 2nd by the blueprint," and roll‑call affirmative responses were recorded; the motion was approved for the work to proceed.

The presentation included no exact completion date or dollar amount in the transcript; the staff member said they had consulted the village engineer and would seek funding. The council asked staff to follow up with the engineer and to present final pricing and a timeline before work begins.