Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Septic Conversion topic

No spam. Unsubscribe anytime.

Study finds ~900 properties for septic-to-sewer conversion; estimated cost $23M, staff seeking grants

Environmental Advisory Board of the City of Fort Myers · July 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A utilities study identified 388 known septic tanks inside city limits and approximately 511 additional unserved properties (rough total ~900). Staff estimated a $23 million cost to convert and is pursuing SRF and other grants, and will present prioritization guidance to the board.

Jason Chandra briefed the board on a 2023 septic-to-sewer study that overlaid county health, building-permit and other datasets and resulted in a prioritized list for conversions. "We have 388 septic tanks, known septic tanks in the city of Fort Myers limits. We have another 511 properties that are currently unserved by a centralized sewer," Chandra said, summarizing the dataset.

The study estimated the conversion cost at about $23,000,000. Chandra said the city lacks a mechanism to tag homeowners with full connection costs and will rely on a combination of small annual capital allocations from council and grant funding (the city has applied for $6,000,000 in SRF principal-forgiveness to reduce the burden). Staff said they would provide the board with the report and a five-minute recap at a future meeting to explain prioritization and how areas near water bodies and rivers were prioritized.