Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Parking Infrastructure topic

No spam. Unsubscribe anytime.

Residents press village on parking-lot repairs, permit parking and landscaping noise

Board of Trustees of the Village of Cedarhurst ยท July 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Residents raised potholes in Parking Lot #1 and asked for permit parking in Lot #9; a business owner requested permit parking and the board said it will study options. A resident complained about noisy landscapers and was advised to report weekend violations to Village Hall.

Several residents brought infrastructure and quality-of-life concerns to the July 13 meeting. Irene Redlus raised safety concerns about large potholes in Cedarhurst Parking Lot #1; trustees said repairs have been made and the village plans to redo the entire lot.

Shaya Harari, owner of Uncle Mochi, asked that permit parking be added to Cedarhurst Parking Lot #9, saying "As a store owner it is very difficult to find parking, especially if he must run in and out throughout the day." Mayor Benjamin Weinstock said the village will conduct a traffic study around the lot and will take the request under advisement; staff noted a permit option exists for meter lots as an interim measure.

Separately, Nirit Jasse complained about noise from landscapers and their equipment; Trustee Eric G. Brown advised that landscapers are not permitted to work on Saturdays or Sundays and asked that violations be reported to Village Hall.