Presenters described a proposed 21-foot-8-inch road, a submitted maintenance agreement assigning upkeep to four lots, and engineering notes that the site drops to a lake with slopes exceeding 5 percent, raising drainage and design considerations.

A presenter described the road design for the subdivision (noted in the transcript as about "a 21 foot 8 road") and said a maintenance agreement had been submitted that would have the four lots maintain the road. The presenter added that "Brent would like to bring in" additional detail to the plan.

The presenter also said the area "drops off" to a lake and estimated more than a 5% slope through the area, which has implications for grading and drainage design. A board member noted that the road is reserved for highway purposes on the tax lot, signaling potential right-of-way implications for ownership and future maintenance responsibilities.