Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Special Use 44 Delaware topic

No spam. Unsubscribe anytime.

Lumberland board approves special-use permit for 44 Delaware LLC's proposed restaurant

Town of Lumberland Planning Board · March 12, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Town of Lumberland Planning Board voted unanimously to grant a special-use permit for an application by 44 Delaware LLC (referred to in the record as 'Local Nest') for a restaurant at a property identified in the hearing notice; the board required plan clarifications on lot coverage and directed county-level filing on loading-dock requirements.

The Town of Lumberland Planning Board voted to grant a special-use permit to 44 Delaware LLC for a proposed restaurant, following a public hearing and board review of site plans and permit standards. The clerk read the public-notice language citing section 250-68a of the Town of Lumberland zoning law and the property described in the notice as 1764 Barrsburg Road in Glen's Bay. The board then took a roll-call vote in which members Dobrzynski, Ocasio, Jensen, Fierro, Smith, and Kaye Smith recorded 'yes.'

The chair read the statutory standards the board must find before issuing a permit and stated the board found those standards met. In the record the chair said, "In granting the special use permit, the planning board shall require evidence of the satisfaction of each and every of the following standards by finding entered into the record of the proceeding," and then reviewed criteria including consistency with the zoning chapter, impacts on neighborhood character, site size and access, infrastructure capacity, environmental protections, and fiscal impact on the town. The board concluded those criteria were satisfied for this application.

During presentation and questioning, the applicant and board discussed details the board asked be clarified on the plans. The applicant was asked to replace a rounded percentage with an explicit lot-coverage figure so the record shows the actual coverage rather than a generic percentage; the board also asked the applicant to show the delivery/loading location on the building plan rather than treating the entire parking lot as a loading area. The applicant stated a required loading-berth dimension for the building: "the loading the loading dock, the loading berth for the for the building needs to be 12 by 65." The board recorded a condition that it would not itself require a separate on-site loading zone and that certain documents should be submitted to the county for its review or approval as the next procedural step.

The public hearing produced no public comments recorded in the transcript. The board closed the hearing after the roll call and findings, and the clerk confirmed proof of mailing, posting and advertising for the hearing. The board's approval grants the special-use permit subject to the record findings and the procedural step of sending required materials to the county for any county-level approvals.

What happens next: the applicant must update the site plan to show the specific lot-coverage numbers and loading/delivery location, and must file or forward required documents to county officials for any county review. The board indicated staff will review the revised plan for the technical clarifications discussed at the hearing.