Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Roads Maintenance topic

No spam. Unsubscribe anytime.

Commissioners hear road maintenance reports; Montrose approaches, 50 Road and John Deere diagnostics noted

Jewell County Commissioners · June 23, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Road supervisor Joel Elkins reported tube coverage work, grading needs near Montrose railroad tracks, a resident's praise for 50 Road condition and that John Deere can remote in to check the new mower at no cost.

Joel Elkins raised multiple road concerns during the June 23 meeting, including efforts to cover drainage tubes and ongoing maintenance needs. He said he had received a phone call from Dwight Frost who told commissioners that 50 Road "is the smoothest it has been in years." Ed Duskie asked that the two blocks leading up to the railroad tracks in Montrose be graded or receive additional rock.

Elkins and Duskie also discussed equipment diagnostics: Duskie said he spoke with the John Deere operation center, which told him it can remotely check the new mowing tractor for error codes at no cost to the county. The commissioners flagged a water crossing east of Lane Underwoods as creating a very rough surface and directed staff attention to that spot.