Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Energy Policy topic

No spam. Unsubscribe anytime.

Green Island sets Dec. 15 hearing on one‑year moratorium for battery energy storage systems and solar farms

Green Island Village Board · November 18, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The village board set a public hearing for Dec. 15 on proposed local law No. 4 (2025), a one‑year temporary moratorium on battery energy storage systems and solar farms to allow officials time to study public‑safety and operational concerns.

The Green Island board voted to set a public hearing for Monday, Dec. 15, on proposed local law number 4 for 2025, which would impose a one‑year temporary moratorium on battery energy storage systems and solar farms. The mayor said the moratorium is intended to give the village time to gather information about safety and operational impacts and is not an outright ban: “It’s just saying there’s a moratorium for a year until we learn more about it,” the mayor said during the discussion.

The mayor pointed to concerns from the police department, fire department and Department of Public Works and said the moratorium could be extended if the village has not obtained adequate information to ensure public safety. The motion to set the hearing was moved by resident Alex Desalani and seconded by a committee member; the motion passed by voice vote.