Board hears concerns about decaying grandstand; consultants propose demolition and phased rebuild options

Rome City School District Board of Education · August 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Consultants told the board the existing grandstand has degraded and was deemed unsafe for public use last summer; options include demolishing the grandstand and restoring the area for future bleachers or constructing new bleachers and concession facilities as part of scenarios, with demolition and rebuild treated as local costs not eligible for most state aid.

Consultants described the grandstand at the stadium as structurally degraded and said the district has performed shoring and bracing to prolong its life. Craig Daley clarified the team would "demolish the grandstand, provide an access location for future bleachers" and restore the area for eventual replacement. When a board member asked whether a portion of rows could be temporarily re‑opened for events, staff said they would return with a structural‑engineering review to evaluate limited use and temporary safety measures.

The consultants explained that stadium support and demolition generally generate little or no state building aid, so much of that work would be a local cost. The scope discussed included roughly 1,000‑seat bleachers and a ~3,000 sq. ft. concession building as conceptual budgeting assumptions; the team noted site constraints, wetlands and code requirements would affect feasibility and cost.