Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water Resilience topic

No spam. Unsubscribe anytime.

Generator leaking antifreeze; Mannsville warns of water-supply risk and bills Ellisburg for temporary interconnect use

Village of Mannsville Board · November 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Minutes record a leaking generator radiator and an urgent repair plan by Storm Power Solutions; Ellisburg interconnect ran 7–10 days, sending about 269,000 gallons — the village will bill Ellisburg at the end of December.

Village minutes say the community generator is leaking antifreeze and staff suspect a broken radiator. The board recorded that Storm Power Solutions will remove the radiator assembly and pressure-test it; the minutes call the repair urgent because a failed generator would prevent filling the village water tower and would force reopening the interconnect with Ellisburg.

Separately, the minutes state the Ellisburg interconnect was open for about 7–10 days and roughly 269,000 gallons were pumped to Ellisburg; the clerk said the village will bill Ellisburg at the end of December along with regular water bills. The board did not record a specific cost for the generator repair in the minutes.