Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Subdivision topic

No spam. Unsubscribe anytime.

Commission approves subdivision allowing one buildable lot on 76-acre tract

Boone County Area Planning Commission · August 6, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The APC approved a minor residential subdivision that creates three lots from two parcels on about 76.15 acres; only Lot 1 will be buildable and the approval includes standard health, drainage and survey conditions.

The commission approved petition 26HA7M158 to combine two parcels and create three lots on approximately 76.15 acres along South 250 West. Staff explained that only Lot 1 will be designated buildable while Lots 2 and 3 will remain in agricultural use; TAC and the highway department listed conditions including septic and well permit requirements, showing tile locations on plans, and a 75-foot top-of-bank easement for Brownlee Ditch.

Petitioner Stacy Walton said the plat will allow the client to live on Lot 1 and continue farming the surrounding land. "By approving this, the client is going to be able to live on Lot 1 and farm all around him," Walton said. The board approved the plat with the listed staff conditions and required recording within the timeframe specified by staff.