Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Waverly Subdivision topic

No spam. Unsubscribe anytime.

Florence authorizes final inspection for Waverly Subdivision Phase I; developer must provide warranty letters

City of Florence Mayor and Board · February 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized city staff and the engineering service to perform a final inspection before placement of final surface asphalt on Waverly Subdivision Phase I and required a two-year warranty for Waverly Drive Phase II and a one-year warranty for remaining Phase I streets.

City Engineer Tim Parker asked the board to require a final inspection before allowing the developer to place the final surface asphalt on Waverly Subdivision—Phase I. The board authorized city personnel and the engineering service to perform that final inspection and, contingent on a satisfactory inspection, to allow the developer to install the final surface asphalt.

The board also required the developer to provide a two-year warranty letter for Waverly Drive Phase II and a one-year warranty letter for the remaining Phase I streets. Alderman Mason Herrin moved to authorize the inspection and warranty requirements and Alderman Kyle Martin seconded; the motion carried unanimously.

The minutes record the board's direction and warranty requirements but do not provide a timeline for inspection or identify the developer by name.