Summary

The maintenance report noted coordination with Green Lake County via a work‑request form to 'Dan' (Dan Berndt), tree limbing at Utley & Ticora, road patching with additional cold mix needed, locates for cemetery headstones, upcoming shoulder work on Menominee and Lakewood, Town Hall cleaning, vehicle maintenance, and delivery of 95.76 tons of salt.

The town's maintenance report recorded multiple public‑works activities and supply deliveries. Green Lake County sent a work‑request form to Dan (identified elsewhere in the minutes as Dan Berndt) for coordination with the Highway Department. Crews limbed trees at Utley and Ticora, performed locates for new cemetery headstones, and patched roads using cold mix (the report noted more cold mix is needed). The report also recorded that shoulders on Menominee and Lakewood need work and that contractor Scotts is expected to come when the weather cools.

The report further recorded non‑road items: Town Hall carpets were cleaned and siding washed; pickup truck batteries were replaced and oil changes performed; and 95.76 tons of salt were received and stored in town sheds for winter use. Lucas called Chairman Moderow to report that shoulder work will be done soon. The board did not record additional action beyond acknowledging the maintenance report in the minutes.