Rankin reconstruction proposed with water-line and storm-drain work; staff to explore grant eligibility

Street Improvement Economic Development Corporation · August 4, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff said Rankin's project will include water-line replacement, storm-drain improvements and full pavement reconstruction, funded from water, EDC and storm-water capital funds; design and construction cost figures were presented but one construction total in the transcript was unclear.

Mara described Rankin as a reconstruction project that addresses aging water infrastructure and frequent flooding.

She said the scope "will include a water line replacement because it's an aging infrastructure and it will include storm drain improvements because currently it is flooding and it needs some improvement and a full pavement reconstruction." Mara said funding for Rankin would come from water, EDC and storm-water capital funds.

During questions a board member noted prior CDBG petitions for Rankin and adjacent streets; staff agreed to review whether those streets still qualify for grant opportunities and to explore options. Brady provided a brief design-cost figure during discussion; Mara and staff gave construction and total-cost figures in the transcript but portions of that sequence were garbled and require verification before publication.