Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Field Maintenance topic

No spam. Unsubscribe anytime.

Hay contract signed; members weigh lime costs and contractor help for field maintenance

Town of Hubbardston Open Space Committee · August 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The committee reported a signed hay contract and discussed high commercial lime spread costs versus a local supplier at $15/ton plus potential contractor assistance to haul/spread and to clear perimeter growth with a grapple-equipped excavator.

Chair Bob Hatch confirmed a signed hay contract with town administrator and contractor Lance Lane. The committee then discussed the cost of agricultural lime and field maintenance: general industry quotes were reported at $100–$125 per ton with additional spreading fees, while a local source provided a quote of about $15 per ton, making the delivery and spread the major expense.

Hatch described a potential local solution: the contractor (Lance) or his brother could haul and spread lime with a 20–30 ton truck and help with brush-hogging and excavator work on field perimeters. "So $15 a ton for what we want is not a huge number," Hatch said, and members agreed to arrange a site visit with Lance to clarify routes, bearing-capacity constraints for heavy trucks and disposal options for woody debris. Mike Stoltz urged caution on road and bridge load limits and recommended confirming haul routes before committing to large deliveries.