Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Visitor Center Renovation topic

No spam. Unsubscribe anytime.

Hague board approves $1,500 project-discovery scope for Visitor Center renovations

Town Board of Hague · September 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board presented and advanced a contract with architect Rebecca Simpkins and engineer Darren Tracy for a project-discovery phase to assess the Visitor Center; the discovery-phase fee was listed at $1,500 to produce measurements and a path-forward document.

The Town Board reviewed a proposed project-discovery contract with Rebecca Simpkins (Archie Warpick Architecture PLLC) and engineer Darren Tracy to assess needed renovations at the Hague Visitor Center, with an emphasis on maintaining a performance space and ADA-accessible bathrooms.

Chair described the three-step discovery scope: (1) site visit and review, (2) existing-conditions measurements and base drawings in 2D and 3D, and (3) a path-forward document that lists prioritized repairs and design needs for the owner (the town board). The chair stated a project-discovery fee for Rebecca Simpkins at $1,500 and indicated the services were scoped for a potential future design phase.

Board members asked who would present the comprehensive-plan changes and confirmed the discovery scope's limited objective. The board scheduled a follow-up comprehensive-plan presentation and public hearing for October.