Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Visitor Center Renovation topic
No spam. Unsubscribe anytime.
Hague board approves $1,500 project-discovery scope for Visitor Center renovations
Summary
The board presented and advanced a contract with architect Rebecca Simpkins and engineer Darren Tracy for a project-discovery phase to assess the Visitor Center; the discovery-phase fee was listed at $1,500 to produce measurements and a path-forward document.
Get email alerts on the Visitor Center Renovation topic
No spam. Unsubscribe anytime.
The Town Board reviewed a proposed project-discovery contract with Rebecca Simpkins (Archie Warpick Architecture PLLC) and engineer Darren Tracy to assess needed renovations at the Hague Visitor Center, with an emphasis on maintaining a performance space and ADA-accessible bathrooms.
Chair described the three-step discovery scope: (1) site visit and review, (2) existing-conditions measurements and base drawings in 2D and 3D, and (3) a path-forward document that lists prioritized repairs and design needs for the owner (the town board). The chair stated a project-discovery fee for Rebecca Simpkins at $1,500 and indicated the services were scoped for a potential future design phase.
Board members asked who would present the comprehensive-plan changes and confirmed the discovery scope's limited objective. The board scheduled a follow-up comprehensive-plan presentation and public hearing for October.

