Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use topic

No spam. Unsubscribe anytime.

Board presses for engineering review, sets escrow for farm subdivision proposal

Ancram Planning Board · March 16, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Sky High/Head Farm representatives told the planning board they want to subdivide part of a 73.75-acre farm so two long-term occupants can own small lots; the board raised concerns about 0.5-acre lots, wells and septic and voted to set up an engineering escrow for consultant review.

Josh, a co-director of the farm operation before the board, said the group purchased the Sigler farm to keep it in agricultural use and that the subdivision would allow two long-term residents in existing mobile homes to own the parcels where they live while keeping most land in farming and conservation.

The engineer described the parent parcel as about 73.75 acres and proposed creating two very small residential lots (about 0.5 and 0.75 acres) and a large remaining agricultural parcel. Board members repeatedly questioned whether wells and septic systems could be safely and legally installed on 0.5-acre lots and whether creating permanent lots around mobile homes was prudent. "It's very hard to get a well and a septic on 0.5 acre if everything's not perfect," the Chair said, urging tests and health-department review.

The board agreed to require further review and set up an escrow for engineering comments before advancing the application; staff will provide instructions to the applicant for escrow payment and consultant circulation.