Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Capital Repairs topic
No spam. Unsubscribe anytime.
Select Board approves electrical work to restore exterior lights and split vestibule switches
Summary
Dalton's Select Board voted to hire Norris Davis Electric to separate interior and exterior light switches and replace several exterior fixtures; the motion carried and staff will arrange work.
Get email alerts on the Capital Repairs topic
No spam. Unsubscribe anytime.
The Select Board authorized electrical repairs to separate the vestibule light circuit from exterior lighting and replace three exterior fixtures to improve parking-lot illumination and safety. The Chair moved, "I make a motion that we proceed with the electrical work for the," which a Committee member seconded; the motion passed.
The board discussed several quotes: $1,100 to rewire and separate entryway switches (two workers, eight hours) and $1,250 to replace three exterior lights. Members emphasized safety concerns in winter darkness and considered options such as LED fixtures and motion or dawn/dusk controls. The contract will be assigned to Norris Davis Electric and staff will follow up on scheduling and scope.

