Gardner City staff report engine failures during recent power-plant run; vibration and false fire-sensing cited

Gardner City Utility Advisory Commission · August 7, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff told the Utility Advisory Commission that during a recent run both engines failed and false readings from vibration and a fire-sensing module triggered the CO2 suppression system; vendors are engaged to troubleshoot.

Staff told commissioners that a requested run of the power plant about a week earlier resulted in both engines failing: one unit tripped due to vibration and the plant received false readings from vibration monitoring and a fire-sensing module that triggered the CO2 fire‑suppression system. “And during the run, both engines failed,” the staff member said, and staff have engaged a vibration-analysis contractor and the fire-suppression company to investigate.

Staff said vendors will coordinate troubleshooting between the vibration system and the fire-suppression system to ensure accurate sensing and to clear spurious trips, and that operations have been resilient despite the recent problems. Commissioners asked for updates as diagnostics are completed.