Water tower in good condition; sewer sludge pumped and annual schedule sought

Madrid Town Board · December 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A wet inspection found Madrid's water tower in 'great shape' with a recommendation to install a mixer to prevent freezing, and the sewer plant had 5,000 gallons of sludge pumped with the board aiming for an annual schedule.

Town officials reported on water and wastewater operations at the Dec. 10 meeting.

Minutes state the water tower wet inspection was completed and that the structure was "in great shape and very clean," with the only recommendation being installation of a mixer to help prevent freezing and protect the liner. Separately, the sewer plant had approximately 5,000 gallons of sludge pumped down; the minutes note the board's intention to move toward a yearly pumping schedule.

No cost estimates or contractor names were recorded in the minutes for the mixer installation or sludge pumping; the notes document condition and recommended next steps rather than contracting decisions.