Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Water Systems topic
No spam. Unsubscribe anytime.
City hears 20‑year drinking water master plan urging asset maintenance and a 1% annual waterline replacement goal
Summary
City engineers and consultants presented a 20‑year drinking water master plan recommending recurring maintenance, targeted capital projects, and a long‑term 1% annual waterline asset replacement goal to preserve system reliability; presenters warned main breaks lowering pressure below 20 PSI would create MDNR public‑health concerns.
Get email alerts on the Water Systems topic
No spam. Unsubscribe anytime.
City Engineer Lauren Snyder introduced a 20‑year drinking water master plan prepared by Lamp Ryerson; consultants Grant Ziebold and Chad Harrington summarized the plan’s maintenance and capital recommendations and the projected budget in 2023 dollars.
Presenters emphasized recurring maintenance (storage cleaning, chemical feed upkeep), replacement-cycle goals and capital projects timed to anticipated growth. The plan frames a 1% annual waterline asset replacement as a long‑term goal: "1% waterline asset replacement theoretically leads to a new system every hundred years, with PVC pipe having an expected life of a 100 years," the presenter said, and consultants warned that increasing main breaks could reduce pressures below 20 PSI — a condition MDNR considers a public‑health hazard.

