Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Roads Infrastructure topic

No spam. Unsubscribe anytime.

Highway commissioner reports quick culvert replacement, equipment repairs and surplus sales

Chemung Township Board · September 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Highway Commissioner Kyle Walter told trustees the township replaced a failing culvert on County Line Road in about five hours, repaired truck #29 for $6,174.54 and sold surplus items that netted $9,109.58. Walter also reported mowing, ditch work and a quote to blacktop over a new culvert.

Highway Commissioner Kyle Walter reported several maintenance wins and equipment updates to the Chemung Township trustees Sept. 17, 2025. He said staff spotted a hole on County Line Road caused by a failing culvert, posted signs, closed the road temporarily and "got culverts out there and replaced them with [a] new culvert in about 5 hours," which the minutes describe as "good teamwork." The minutes record the truck #29 F-550 tank replacement and computer recalibration at a repair cost of $6,174.54.

Walter also reported the township sold truck #7, a 6-foot rotary mower and other small items on Wisconsin Surplus Auctions, netting $9,109.58, and completed the third mowing of the season for ditches (including a welded hitch repair). He said staff met with McHenry County DOT regarding bridges on Hunter and White Oaks and received a quote from Majestic Asphalt to blacktop over a newly installed culvert on County Line Road; the minutes say the township may blacktop the Stateline Road shoulder next year to prevent future washouts.