Board of Appeals votes at a glance: four cases approved Sept. 5, 2024
Summary
On Sept. 5 the Calvert County Board of Appeals unanimously approved three critical‑area/general variances (cases 24‑4199, 24‑4200, 24‑4201) and a special exception for a Flag Harbor tavern (24‑4202), each with conditions described in the hearing record.
Get email alerts on the Meeting Actions topic
No spam. Unsubscribe anytime.
The Calvert County Board of Appeals concluded its Sept. 5 hearing by approving four contested applications; votes were unanimous in the recorded proceedings.
Decisions at a glance: • Case 24‑4199 (CO Barrett LLC / Vanwinter property, 1414 Grama Drive): Granted critical‑area variance and reduction of a 10‑foot setback to zero for proposed pool, patio and cabana. Board cited a 40% reduction in legally nonconforming impervious surface, required stormwater management and mitigation as bases for findings.
• Case 24‑4200 (JLT Homebuyers LLC, 3415 Cliff Trail): Granted after‑the‑fact critical‑area variance and two general variances for replacement and expansion of decks. Approval conditioned on permit compliance and completion of mitigation (two conditions stated on record).
• Case 24‑4201 (CD Reed and Sons, 12172 Bonanza Trail): Granted critical‑area variance for disturbance to steep slopes/expanded buffer to permit construction of a modest single‑family dwelling; board accepted need based on septic and stormwater siting constraints.
• Case 24‑4202 (Flag Harbor LLC / Flag Harbor Boatyard, 1565 Flag Harbor Boulevard): Granted a special exception for a seasonal open‑air tavern with multiple operational conditions: owner‑specific approval, seasonal May 1–Nov 1 operation, hours Thursday–Sunday noon–9 p.m., no amplified music (comply with 65 dBA county standard), consumption confined to a designated on‑site area (on‑sale only), limit of up to two food trucks at a time, and requirement to obtain all permits and health approvals. Staff indicated site‑plan and permit review, public‑safety coordination and possible traffic‑calming follow‑up will be required.
Next steps: in each approved matter the applicants must complete applicable permits, mitigation plans and health‑department approvals; staff will prepare formal orders reflecting the board’s findings and conditions.