Citizen Portal

Get email alerts on the Facilities Maintenance topic

No spam. Unsubscribe anytime.

Impact Field maintenance and equipment upgrades cleared by trustees

Village of Rosemont Board of Trustees · March 9, 2026

Summary

The board approved multiple Impact Field projects, including a $60,299.52 production booth switcher, $119,250 outfield waterproofing, $84,350 backstop and scoreboard netting extension, and $64,000 in carpet installation.

Trustees unanimously approved a package of maintenance and equipment upgrades for Impact Field. Motions included a $60,299.52 CTI proposal to replace the production booth switcher, a $119,250 National Restoration Systems proposal for outfield waterproofing, and an $84,350 Peerless Fence proposal (with related engineering) to extend backstop and scoreboard netting. A Trevino Flooring $64,000 carpet-installation proposal for Rivers Club and a home locker room also passed.

Each motion was presented and carried without recorded opposition; the minutes do not list project schedules or separate funding-source details for the Impact Field items.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source