Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Planning Subdivision topic

No spam. Unsubscribe anytime.

Board accepts final plat for Range USA subdivision; northern lot cleared for future development

Village Board of Shorewood · March 10, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board accepted the final plat creating two lots from the existing Range USA parcel near the shooting range on Northeast Frontage Road; the southern lot retains the existing building and pond while the northern lot is cleared for future development subject to required stormwater work.

The board accepted a final plat for the Range USA subdivision on a resolution adopted March 10. Economic Development Director Natalie Engel told the board the proposal creates two lots: "The southern lot would be the lot 1 Range USA, which is their building and their pond. And then the northern lot would be available for development."

Engel said stormwater management was contemplated during the original development and staff, the village engineer and Planning & Zoning reviewed the final plat and recommended approval. Trustees voted in favor by roll call.