Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Board hires Steinmeier Engineering for Silver Hollow Road flood work; rate specified

Town of Woodstock Town Board · August 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

To address post-flood damage on Silver Hollow Road, the town authorized retaining Steinmeier Engineering for municipal engineering services and included compensation language in the resolution (transcript reads "not to exceed $195 an hour").

The Woodstock Town Board authorized retaining Steinmeier Engineering to provide professional engineering services for town infrastructure projects, citing the firm's prior work with town departments and experience addressing the gap created by flooding on Silver Hollow Road.

The resolution as read in the meeting states that "Steinmeier Engineering shall be compensated at the hourly rate, not to exceed $195 an hour" and authorizes the town supervisor to execute documents necessary to effectuate the engagement. The motion passed by voice vote.

No contract text or total not-to-exceed amount was provided in the meeting transcript; the board recorded the hourly rate language during the resolution reading and approved the authorization to retain the firm.